Panel & Service Upgrades · Vancouver
Electrical Panel and Service Upgrades in Vancouver, BC
A panel upgrade is two jobs that people treat as one: the panel inside the house, and the service that feeds it. Knowing which one you actually need is what keeps the price sensible.
Panel or service?
The panel is the box of breakers or fuses inside. The service is what feeds it: the conductors from BC Hydro, the meter base and the mast or underground conduit. A fuse panel or a panel with no spare spaces can often be replaced at the same amperage. A house adding a heat pump, an EV charger, a suite or an induction range may need the service itself increased, usually from 100 to 200 amps, which involves the utility.
What is checked before the quote
- Load calculation to the Canadian Electrical Code as adopted in BC, for the house as it is and as you plan it.
- Service entrance: overhead or underground, the mast, the meter base and its location, and clearances.
- Grounding and bonding, which in older houses is often a clamp on a water pipe that has since been replaced with plastic.
- Existing circuits, so double-tapped breakers, undersized wire and old aluminum or knob-and-tube connections are dealt with, not just moved into a new box.
How the upgrade runs
The contractor applies for the electrical permit and arranges the disconnect and reconnect with BC Hydro. On the day, power is off for several hours while the panel and service equipment are changed, then the circuits are reconnected and labelled and the work is inspected. An underground service or a meter that has to move takes longer and costs more, and the quote says so up front.
Fuse panels and insurance
Many insurers ask about fuse panels and older breaker panels at renewal. A written plan and a permit number usually settle the conversation.
Frequently asked questions
How long is the power off for a panel upgrade?
Usually several hours on the day, sometimes most of a day for a full service change. The schedule is set with BC Hydro and confirmed in advance.
Do I need 200 amps?
Not always. A load calculation shows whether the existing service can carry your plans, possibly with a load management device. If it cannot, 200 amps is the usual upgrade for a house.
Can my panel be moved?
Yes, as part of an upgrade or renovation, within code rules for location and access. Moving the meter also involves the utility.
Request a Quote
Call 236-200-0651 or send the form and we will get back to you within one business day.
Serving Vancouver and surrounding areas. Contact us for a no-obligation quote specific to your property.